Skip to content
CouncilHound
← Projects & topics
Plan or program · on the record since 2025

Commercial Property Assistance Clean Energy Program

in progress

The Northfax East-West Roadway is a City of Falls Church capital project to construct a new east-west roadway between Chain Bridge Road and University Drive Extension. The project has been advanced through two rounds of VDOT Revenue Sharing Funding applications.

The Blenheim Boulevard Multimodal Improvements Project (UPC-107013) is a city transportation corridor upgrade adding walking and biking infrastructure, benches, and an amphitheater, running from Blenheim Hall Drive to Ridge Avenue. The project has been in planning and design for several years, with construction expected to begin in 2025 per early-year projections; utility relocation was underway as of March 2026, with construction start revised to later in 2026 or early 2027.

denied

The George Snyder Trail was a planned off-street shared-use path project (VDOT UPC 112816) intended to improve multimodal connectivity along Fairfax Boulevard in the City of Fairfax. The project drew sustained and significant public opposition throughout its consideration.

in progress

The Old Town Parking Study is a city-commissioned analysis of parking demand and utilization in and around Old Town Fairfax City. The study was conducted by a consultant who performed detailed field analysis of parking lots and utilization rates throughout the Old Town area; the data collection occurred in fall 2024, and the study was completed in 2025.

in progress

The Willard-Sherwood Health and Community Center is a joint City of Fairfax and Fairfax County redevelopment project at 3740 and 3750 Blenheim Boulevard, replacing existing facilities with a new health, wellness, and recreation center featuring an underground parking garage, rooftop amenity space, fenced outdoor playgrounds, and a bridge connection to the existing Stacey C. Sherwood Community Center.