The General Zoning Text Amendments are a set of zoning text changes initiated by the Planning Commission. 9 separate matters touch this plan or program; each has its own status.

Private Development · Under Review

Courthouse Plaza

in progress

Courthouse Plaza (10300 Willard Way and 3922 Blenheim Boulevard) is a shopping center redevelopment project in the CR Commercial Retail/Old Town Fairfax Transition Overlay District, proposed by Combined Courthouse, LLC. The project has proceeded through two distinct application cycles.

Chick-fil-A applied for a special use permit, special exceptions, and a certificate of appropriateness to modify its existing drive-through and building at 9509 Fairfax Boulevard (SU-24-00078/SE-24-00079). The proposed project includes a building addition, dual drive-through lanes, and widening of the pick-up window lane.

The Jermantown Road Corridor Improvements is an active City of Fairfax capital infrastructure project focused on transportation improvements along the Jermantown Road corridor. The project first came to Council attention in March 2025, when Councilmember Hall requested that information on Jermantown Road CIP improvements be brought to a future council meeting.

The Urban Forest Master Plan (UFMP) is the City of Fairfax's first comprehensive, 20-year roadmap for stewardship of its urban forest. Development began in May 2024 and proceeded through two Steering Committee meetings, two public open houses (July and October 2024, with a third in October 2025), stakeholder interviews, a public survey, and ongoing presentations to the Planning Commission, PRAB, Environmental Sustainability Committee, and City Council.

in progress

The Northfax East-West Roadway is a City of Falls Church capital project to construct a new east-west roadway between Chain Bridge Road and University Drive Extension. The project has been advanced through two rounds of VDOT Revenue Sharing Funding applications.

The Blenheim Boulevard Multimodal Improvements Project (UPC-107013) is a city transportation corridor upgrade adding walking and biking infrastructure, benches, and an amphitheater, running from Blenheim Hall Drive to Ridge Avenue. The project has been in planning and design for several years, with construction expected to begin in 2025 per early-year projections; utility relocation was underway as of March 2026, with construction start revised to later in 2026 or early 2027.

denied

The George Snyder Trail was a planned off-street shared-use path project (VDOT UPC 112816) intended to improve multimodal connectivity along Fairfax Boulevard in the City of Fairfax. The project drew sustained and significant public opposition throughout its consideration.

in progress

The Old Town Parking Study is a city-commissioned analysis of parking demand and utilization in and around Old Town Fairfax City. The study was conducted by a consultant who performed detailed field analysis of parking lots and utilization rates throughout the Old Town area; the data collection occurred in fall 2024, and the study was completed in 2025.

in progress

The Willard-Sherwood Health and Community Center is a joint City of Fairfax and Fairfax County redevelopment project at 3740 and 3750 Blenheim Boulevard, replacing existing facilities with a new health, wellness, and recreation center featuring an underground parking garage, rooftop amenity space, fenced outdoor playgrounds, and a bridge connection to the existing Stacey C. Sherwood Community Center.

In full

The City Council held a work session on the amendments at its June 3, 2025 meeting, as reported by staff to the Planning Commission on June 23, 2025. The amendments were subsequently approved unanimously by the City Council at its July 22, 2025 meeting, as confirmed by the dated record from the October 13, 2025 Planning Commission meeting. The matter is now fully resolved.